Victoria Day Preparations
Saturday May 8th was a busy day at the site as the switching crew under the watchful eye of foreman Don Weymouth, Dennis Pringle, Ted VanGunst and new trainman trainee Scott Lang had both xCN6514 and xCN9000 operating to perform equipment moves that will facilitate the running of a passenger train on our opening weekend May 22nd.
And thanks to Brad Rae and others, the 9000 will be on the head end performing her duties of pulling the first train of our 2010 season in full green, black and yellow colours.
The shop crew has just run out of time and manpower to complete the re-assembly of xCN1392 for May but should have everything back together for the July operations.
Terry Wolfe
Saturday May 15
Lots of volunteers present. Track repairs going on, fill dirt being levelled, repairs to sidewalks and inside of display cars being cleaned, The gift shop is being readied for the long weekend - new stock, re-arranging shelves and general cleanup.
|
Recent PostsAlberta Railway Museum24215 34 St. Edmonton, AB |